MUST new product pv3300tlv 6kw 48vdc split phase off grid solar inverters generator
- Minimal order
- 100 pieces
Message Phone call
Product Specifications
--
Product Description
Overview
Quick Details
Place of Origin: Guangdong, China
Brand Name: MUST
Model Number: PV3300 TLV
Input Voltage: 120V./230V
Output Voltage: 110V/115V/120V/220V/230v/240v
Output Current: 40A
Output Frequency: 50/60Hz
Output Type: Single
Size: 747*376*296mm
Type: DC/AC Inverters
Inverter Efficiency: 82%
Certificate: CE/ISO9001
Warranty: 12 Month, 12 month
Weight: 20-50kg
Product name: PV3300TLV
Protection: Overload and short-circuit
Color: Silver, blue
Inverter type: Off-grid Inverter
Wave form: Pure sine wave
Frequency: Low frequency
Phase: Single phase
Power factor: 1.0
Overload Capacity: 200%
Packaging & Delivery
MUST new product pv3300tlv 6kw 48vdc split phase off grid solar inverters generator
Features:
• Pure sine wave output
• Friendly user interface;MFD (multi-function display)
• 3 Steps charging
• Overload and short-circuit protection
• Set charging voltage/charging current.
• Battery low voltage shutdown point can be set to 10/10.5/11V
• Set utility priority/ Battery priority
• Set utility input wide/narrow range
• Inverter voltage can be set to 100/110/120;frequency can be set to 50/60Hz
• Set utility charging on/off switch
Packaging & Shipping
Carton box: 747*376*296mm
Gross Weight: 50kg
Delivery Detail: Sample order for 5-7day; Bulk order for 20-25working days
MUST COMPANY PROFILE
Welcome to visit our company and factory !
Shenzhen Mustups Power Limited established in 1998, with the headquarter in Hongkong, which is a professional hi-tech enterprise specialized in Power Inverter, Solar Power, VRLA Battery development, manufacturing, sales and after-service.
Our comprehensive product lines include:Power inverter, Solar inverter, Solar charge controller, Solar battery and some other related Solar products.
Most of products from Mustups applied with CE, FCC certificates. The main markets are Ukraine, Russia, Vietnam, Thailand, Pakistan, India, etc. Must Power Limited is one of the authorized suppliers for China Citic Bank, Ministry of Information Industry of China, Ministry of Power Industry of China, Ministry of Transportations of China.
WHY CHOOSE US!
R&D Milestones
1.Simplify, faster performance,
2.More remarkable achievements:
3.More stable, purer, safer…
4.Less damage:
5.Less waste, less noise, less mass…
6.Overall Efficiency: 98%>85%
With an excellent R&D team formed by over 30 engineers and a skilled, dedicated workforce, together 10,000 square meter in-house manufacturing facilities in Guangdong China, Shenzhen Mustups has innovated, developed and improved the products to meet the demands of customers and keep pace with changing demands of the industries. With ‘close to customer’ notion, we have aligned most of its resources to support our Original Equipment Manufacturer (OEM) customers, and work with our customers as power partners. Our mission is to be the best supplier of power solutions, and to accomplish this, we will continue to tailor products for market needs while maintaining high quality, integrated customer service and prompt delivery.
FAQ
Q1: How to choose a right inverter?
A1:Tell us your demands, then our sales will recommend a suitable inverter to you.
Q2: What's the different between inverter and solar inverter?
A2: Inverter is only accept AC input, but solar inverter not only accept AC input but also can connect with solar panel to accept PV input, it more save power.
Q3: How about the delivery time?
A3: 7 days for sample; 25 days for bulk order.
Q4: What is the warranty of inverter?
A4: 12 YEARS warranty on Must-Solar product.
Q5: How to solve the technical problem?
A5: 24 hours after-service consultancy just for you and to make your problem to solve easily.
Supply Ability
--
Packaging and Shipping
Lead time
--
Port
--
Packaging details
--