zddshop
/
Product
/
Solar Energy Products
/
centralized heating, centralized heat storage solar water heating system

centralized heating, centralized heat storage solar water heating system

$1800 /piece price excl.VAT

Negotiable
Order

Minimal order
100 pieces

Message Phone call

Product Specifications

--

Product Description

Overview

Quick Details

Place of Origin: China

Brand Name: Libang

Model Number: Flat panel & Evacuated Tubes

Type: Flat Panel

Application: Solar Thermal

Pipe Material: Copper

Collector Type: Flat panel or Evacuated Tubes

Auxiliary Heat Source: Heat Pump or Boiler, Electric heater

Application 1: Centralized Hot Water System

Application 2: School

Application 3: Apartment

Application 4: Hotel

Capacity: 1-300 tons

Installation: Engineer available overseas service

Design: Free design fee

Name 2: Large Solar Water Heater Project

Supply Ability

Supply Ability: 1000 Ton/Tons per Month

Packaging & Delivery

centralized heating, centralized heat storage solar water heating system from China suppliercentralized heating, centralized heat storage solar water heating system from China supplier

 

Application& Copperation Process

Application: Especially for large-scale hot water heating system, supplying hot water for apartments, hotels, restaurants, schools, hospitals, factories, swimming pools, and other places requiring large amount hot water use.

 

Solar Water Heating System Cooperated Process:

1: Collect infomations about the project from customers. Such as Roof Area, water consumption, etc.

2: Design the solar water heater systems for customers and show the princple drawing to customer.

3: Send quotation to customer.

4: Customer pay deposit.

5: Arange the production of main materials(such as solar panel, water tank, airsource heat pump etc.) for you.

6: Shipping the goods, and show the B/L to you. Mean time you should pay the balance to us.

7: When you received the main materials, we send our engineer to assit you.

8: After the inspection of our engineer, they will list all the other materials which are needed. Such as PEX pipes, copper fittings and so on. These materials could be provided by customers, or by us.(We suggest that customers buy them from local market, because if these materials provide by us, the shipment will takes around 20-35 days.)

9: Installation and debugging.

10: Training your staffs.

 

Building surface (including the flat roof, sloping roof) concentrate the solar collectors, heat a large centralized configuration storage tanks (water tank can be placed in rooftop or equipment within the interlayer).

 

 

  For residential buildings are generally not equipped with centralized auxiliary heating, hot water pipe attached to each household, household configure the secondary electric water heaters, gas water heaters, solar water heating equipment and the corresponding setting automatic water metering switch, display instruments. For residential buildings, you can also choose to focus on the auxiliary heating.

 

  For factories, schools, hospitals, hotels, general centralized auxiliary heating; it can set frequency of water supply, constant temperature backwater, all-weather heated water or regular water supply and other functions.

Supply Ability

--

Packaging and Shipping

Lead time

--

Port

--

Packaging details

--


Comments
Welcome to zddshop comments! Please keep conversations courteous and on-topic. To fosterproductive and respectful conversations, you may see comments from our Community Managers.
Sign up to post
Sort by
Show More Comments

Other offers of this wholesaler

Copyright 2023-2025 - www.zddshop.com All Rights Reserved